The matrix below depicts the PPM V2.0 artifacts and whether or not each is required, not required, or candidates for tailoring by project type. Artifacts are templates in which to document the work performed by the project team as it proceeds through the PPM Life Cycle and conducts the tasks and activities necessary to deliver an IT system or service.
For your convenience, the artifacts are provided in PDF and either Word, Excel or MS Project formats depending on the artifact.
In the Artifact column, hover over each title for a brief description of the artifact. To learn more about the submission process, use the PPM V2.0 Governance link under Related Information.
The IT PM's main responsibility is to ensure that all artifacts bear the minimum requested Approver signatures prescribed in the Artifact Signature Matrix. For greater security, the signature page should be signed electronically using the Approver's PIV credential. A User Guide covering the preparation and the signing process and a Quick Reference sheet are included below:
PPM V2.0 Artifact Endorsement Form
PPM V2.0 User Guide to Preparing and Signing the HUD Signature Form
PPM V2.0 Quick Reference for Preparing and Signing the HUD Signature Form
Artifact Dispositions by Project Type
- R = Required: Artifact is always used
- NR = Not Required: Artifact not needed
- MBA = May Be Applicable: Need for artifact depends on project type and may be a candidate for tailoring
- * = A Security and Privacy Artifact. These must be accessed through their respective HUD intranet sites.
If you have any suggestions on how we can improve any of these artifacts, please send an email to PPM@hud.gov.
Artifact
|
Artifact Documents
|
COTS/GOTS
|
SaaS
|
Modifications/ Enhancements
|
Custom Development
|
Decommission
|
Initiation Phase
|
||||||
Project Initiation Form (PIF) |
R
|
R
|
R
|
R
|
NR
|
|
Project Charter |
R
|
R
|
R
|
R
|
NR
|
|
WBS/Project Schedule |
R
|
R
|
R
|
R
|
R
|
|
Procurement Management Plan |
MBA
|
MBA
|
MBA
|
MBA
|
NR
|
|
Lessons Learned |
R
|
R
|
R
|
R
|
R
|
|
Planning Phase
|
||||||
Project Tailoring Agreement (PTA) |
R
|
R
|
R
|
R
|
R
|
|
Project Management Plan |
R
|
R
|
MBA
|
R
|
NR
|
|
Concept of Operations (CONOPS) |
R
|
MBA
|
MBA
|
R
|
NR
|
|
Requirements Definition Document |
R
|
R
|
MBA
|
R
|
NR
|
|
Requirements Management Plan |
MBA
|
MBA
|
MBA
|
R
|
NR
|
|
Requirements Traceability Matrix (RTM) |
R
|
R
|
R
|
R
|
NR
|
|
Risk Management Plan |
MBA
|
MBA
|
NR
|
MBA
|
NR
|
|
Risk Management Log |
R
|
R
|
MBA
|
R
|
NR
|
|
Quality Assurance Plan |
MBA
|
MBA
|
NR
|
R
|
NR
|
|
Communications Management Plan |
MBA
|
MBA
|
NR
|
MBA
|
NR
|
|
Independent Verification and Validation (IV&V) |
R
|
R
|
MBA
|
R
|
NR
|
|
Solution Architecture Document |
R
|
R
|
MBA
|
R
|
NR
|
|
Decommission Plan |
NR
|
NR
|
NR
|
NR
|
R
|
|
FIPS 199* |
R
|
R
|
MBA
|
R
|
NR
|
|
Privacy Requirements |
R
|
R
|
R
|
R
|
R
|
|
Execution and Control Phase
|
||||||
Technical Design Document (TDD) |
R
|
MBA
|
MBA
|
R
|
NR
|
|
Interface Control Document |
R
|
MBA
|
MBA
|
R
|
NR
|
|
Change Management Log |
R
|
R
|
MBA
|
R
|
NR
|
|
Implementation Plan |
R
|
R
|
MBA
|
R
|
NR
|
|
Test Plan/Test Reports |
R
|
MBA
|
MBA
|
R
|
NR
|
|
DOC | PDF | ||||||
Data Conversion Plan |
R
|
MBA
|
MBA
|
R
|
NR
|
|
Training Plan |
MBA
|
MBA
|
NR
|
MBA
|
NR
|
|
User Manual |
R
|
R
|
MBA
|
R
|
NR
|
|
Operations and Maintenance (O&M) Manual |
R
|
NR
|
MBA
|
R
|
NR
|
|
DPPD Application System Retirement Request |
NR
|
NR
|
NR
|
NR
|
MBA
|
|
IAS Inactivation Form |
NR
|
NR
|
NR
|
NR
|
MBA
|
|
Security Assessment & Authorization to Operate (ATO) Request |
R
|
R
|
R
|
R
|
NR
|
|
Close Out Phase
|
||||||
Project Completion Report |
R
|
R
|
R
|
R
|
NR
|
|
Post-Decommission Report |
NR
|
NR
|
NR
|
NR
|
R
|
Related Links:
- PPM V2.0 Home Page
- PPM V2.0 Introduction and User Guides
- PPM V2.0 Project Type Guides and Tools
- PPM V2.0 Roles and Responsibilities
- PPM V2.0 Governance
- PPM V2.0 FAQs