PICTEST
Offline for Testing
December
24, 2003: PICTEST will be offline for testing during the period
from 4 p.m. Eastern on December 24th to Noon Eastern on December
29th. Users will not be able to log on to PICTEST. However, the
PIC Production system will be available throughout the holidays
to accept data.
PIC Weekend Shutdown Planned
December 18, 2003: PIC will be offline and unavailable
for use from 8:00 p.m. Eastern (5:00 Pacific) on Saturday, December
20th until about Noon the following day. This shutdown is for planned
maintenance to PIC hardware and the system infrastructure in order
to be able to serve you better and more reliably. We thank you for
your patience.
Expiration & Extension of Form HUD 50058
December 17, 2003: The PIH web page at http://www.hud.gov/offices/pih/systems/pic/50058/pubs/
and the HUDCLIPS page http://www.hudclips.org/ are still showing
a date on the top right hand corner of the Form HUD 50058 indicating
that the form expires 9/30/2003. However, Form HUD 50058 has been
revised and is going through an OMB clearance process. The OMB has
authorized the extension of the Form HUD 50058 (6/2001) during the
OMB review and clearance. The 6/2001 version of the form will remain
valid until the revised Form HUD 50058 is posted to HUDCLIPS and
PIH makes the required modifications to the PIC system to process
the revised form.
SEMAP 9/30 Reminder - 9/30 SEMAP Certifications
due by Nov. 29
November
20, 2003: Reminder - For all Section 8 PHAs with FYE of 9/30/2003
and with 250 or more vouchers under contract as well as smaller
Section 8 PHAs that are designated "Troubled", your SEMAP
certification must be submitted in PIC no later than Saturday, November
29, 2003 (8 days to go). PHAs with less than 250 vouchers under
contract who are not designated "Troubled" need not submit
a certification this time but may do so if they so choose. If you
submit a certification, it will be scored. If you are not sure whether
you are required to submit, call your local HUD Field Office. If
you are having technical problems with PIC SEMAP, call PICHelp at
1-800-366-6827.
"9500" Errors in PIC
October
30, 2003: During the past few hours there have been reports
of users receiving "9500" errors which say they must relogon
to PIC. However, when they relogon, they get the same error message.
Technical staff checked and Web Server #2 was causing the problem.
PIC has five web servers and the other four were working normally.
The problem has now been corrected and Web Server #2 is running
normally again. Sorry for any inconvenience you may have experienced.
Updated Community Service Reminder - HAs must
report the data using Form 50058
October
27, 2003: Updated Reminder - PHAs that administer Public
Housing programs must ensure that all affected residents are performing
their community service or self-sufficiency requirement by October
31, 2003 and report this information in the PIC Form 50058 module.
The Office of PIH will begin checking PHA compliance with the community
service and self-sufficiency requirement on a regular basis. See
Notice
PIH 2003-17 or contact your local field office for additional
guidance on the reinstatement of the community service and self-sufficiency
requirement. Note that PHA should no longer use "N/A"
(which is coded as "5" on line 3q of the Form HUD-50058)
when indicating a resident's community service or self-sufficiency
status. The Form HUD-50058 Instruction Booklet contains information
on when to use each of the valid codes (1, 2, 3 or 4) for line 3q
to accurately report a resident's community service or self-sufficiency
status.
SEMAP Reminder for FYE 9/30/2003 - SEMAP certification
due in PIC by 11/29/2003
October 24, 2003: This is a reminder to PHAs with Section
8 programs with 250 or more contracted voucher units and FYEs of
9/30 that your SEMAP certifications are due in PIC by no later than
Saturday, November 29, 2003. Failure to complete the certification
and to submit it in PIC by the due date will result in a SEMAP designation
of "Troubled" for your agency. You should start the SEMAP
certification process well in advance of the due date to allow time
to resolve any problems within the schedule. Please contact your
Field Office staff with programmatic questions and call the PICHelp
line (1-800-366-6827) with PIC technical questions.
Community Service-Self Sufficiency Action Due
on 10/31/03
October 23, 2003: Public housing agencies (PHAs) that administer
a Public Housing program must ensure that all affected residents
are performing their community service or self-sufficiency requirement
by October 31, 2003. See Notice
PIH 2003-17 or call your local field office for additional guidance
on the reinstatement of the community service and self-sufficiency
requirement.
PIC to Shutdown at 4 PM Today - PIC shutdown
to support Presidential Initiative
October 15, 2003: PIC will be taken offline for all users
today (Wednesday) at 4:00 p.m. Eastern (1:00 p.m. Pacific) to permit
unrestricted load testing of the prototype software for Upfront
Income Verification, which supports a Presidential Initiative. We
regret the short notice. PIC will be back online on Thursday morning.
Form 50058 Throughput Issues - Slow down in
processing 50058 uploads
October 7, 2003: PIC is experiencing significant slowdowns
processing Form 50058 uploads. Processing continues but the problem
has caused the processing time to lengthen to hours. We are investigating
the problem and regret the inconvenience to users. No data or files
are being lost and users may continue to upload data. We will report
when the problem is corrected.
Changes to PIH Web Forums
Beginning on October 20, 2003 HUD updated the
software forums to consist of three venues:
1. PIC Form 50058 (for all users)
2. Family Reporting Software (FRS) (for FRS users)
3. Form 50058 Software Vendors Forum (Password Required)
(Vendors requiring a password should use the link on the forum page
to request it.)
Forums page >>> http://www.hud.gov/offices/pih/forums/index.cfm
SEMAP Indicator 12 not turned on - HQS Inspection
Indicator will remain off for now
October
2, 2003: We had previously announced PIH would turn scoring
of SEMAP Indicator 12 (Annual HQS Inspection) for HAs with a Fiscal
Year End of 6/30/2003. However, due to system problems, this has
not been done. Indicator 12 will not be scored for 6/30/2003 and
whether it will be scored for 9/30/2003 remains to be determined.
We apologize for the confusion.
PIC Release 5.1 Delayed - Security hole to be
plugged
September
2, 2003: Implementation in PIC Production servers of Release
5.1 has been delayed three weeks due to a major security issue that
arose in testing. PIH Management determined that it was in the best
interests of PIC Users to delay the release until the security problem
could be resolved. We apologize for the resulting inconvenience.
The release will now be installed on PIC Production servers beginning
on Friday, September 12 at 8 p.m. Eastern ( 5 p.m. Pacific). The
system will be available to users after testing is completed, which
should be later on Saturday.
PIC Release 5.1
August
25, 2003: Unforeseen technical difficulties have caused a delay
in the release of PIC version 5.1. A new release date will be announced
shortly. We regret any inconvenience caused by this delay and we
thank you for your patience.
PIC Release 5.1 On-schedule
August
22, 2003: The PIC Change Control Board has approved an August
23rd (Saturday) date for implementation of Release 5.1 into PIC
production. The installation will begin Friday evening after business
hours. The system will be offline during the installation process.
This date is subject to change for operational reasons. We will
report any schedule changes via PIC Headlines and the PIC Home Page.
We regret any inconvenience this scheduled outage causes and we
thank you for your patience.
Change of Plans for PIC Releases
August
06, 2003: There will now be two releases to PIC production during
August. The first release (an emergency release labeled "5.0.1")
will upgrade the security and encryption functions in PIC in order
to support the future Upfront Income Verification ("UIV")
prototype. It is scheduled for installation in the next several
days when testing is completed. The second August PIC release (now
re-labeled "5.1") is the same quarterly release we have
been calling "4.2". It is still scheduled for User Acceptance
Testing August 11-15 and installation in PIC production the night
of August 22. The only change is the new "5.1" label for
the release.
PIC Release 4.2 Planned
August
01, 2003: The PIC Change Control Board has tentatively approved
an August 23rd (Saturday) date for implementation of Release 4.2
into PIC production. The installation would begin the preceding
Friday evening after business hours. The system will be offline
during the installation process. This date is subject to change
for operational reasons. We will report any schedule changes via
PIC Headlines and the PIC Home
Page.
SEMAP 6/30 FYE Reminder
July 29, 2003: SEMAP certifications are due 60 days after
the PHA Fiscal Year End (FYE). Certifications must be "submitted"
to HUD when completed in PIC. Failure to submit the certification
by the due date earns automatic "Troubled" status in SEMAP.
Certifications for the 6/30 FYE must be submitted in PIC by Friday,
8/29/03. If you have questions or problems, call your PIC Coach
in the local field office. (31 days left and counting down). Please
note that the reduced certification requirements for small PHAs
do not take effect for 6/30/03 FYE. All SEMAP-eligible PHAs with
a 6/30 FYE must certify.
Hardware and Infrastructure Problems Blamed
July
23, 2003: PIC has experienced intermittent system outages during
the past two weeks. On Saturday, July 12, the Internet service provider
that supports HUD suffered a system outage which effectively blocked
access to PIC and REAC for several hours. On Wednesday (July 16)
and Friday (July 18) PIC went off line for about an hour each time
due to database server hardware problems. These problems have been
resolved and additional precautions have been taken. We apologize
to our users for any inconvenience. HUD and contractor staff are
closely monitoring the operations of all system components (hardware/software/infrastructure)
to prevent or minimize any further disruption of services.
6/30 FYE SEMAP Certifications due 8/29/03
July 17, 2003: SEMAP certifications are due 60 days after
the PHA Fiscal Year End (FYE). Certifications must be "submitted"
to HUD when completed in PIC. Failure to submit the certification
by the due date earns automatic "Troubled" status in SEMAP.
Certifications for the 6/30 FYE must be submitted in PIC by Friday,
8/29/03. If you have questions or problems, call your PIC Coach
in the local field office. (43 days left and counting down).
|