|
The purpose
of PAE Training and Guidance web page is to provide PAEs the perninent information
and tools needed to do their assigned work. If you have any questions and/or are
experiencing problems accessing any of the tools please e-mail
us @OAHP. OAHP
TOOLS TPA
Processing and Closing Docket Submission. OAHP recently completed research
intoTPA processing practices (and its impact on submitting Closing Dockets). The
research resulted in several improvements that OAHP believes will streamline the
processing and improve delivery of the Closing Dockets. The zipped
file contains the following documents: Memo describing improvements; revised
Appendix D of the OPG; revised Chapter 8 of the OPG, Revised Modified TPA Approval
Letter; New PAE Certification for Preliminary Full TPA Approval; and New PAE Certification
for Final Full TPA Approval. (April
22, 2004) Appendix D: TPA Tools
(zipped file) was updated on April 27, 2004, in coordination with the changes.
M2M
Underwriting Models: Any new deals should be started using these revised models.
At this stage, older deals should be on Standard revision 4.36 or IRP Bifurcation
revision 4.46. Upgrading a 4.36 or 4.46 model is optional; however, an upgrade
is strongly recommended for any model that is older than 4.36 or 4.46. Model revisions
are indicated on the upper right corner of the StartInput worksheet. Also, Forms
7.4 (7.4 Claim Payment Checklist and 7.4a HUD-Held Restructuring Summary Checklist)
have been automated and added to the model.
Form
7.19 M2M Official Term Sheet (February 4, 2003)
|
MS
Excel (Model Revision 4) Updated 5/6/2003 |
|
MS
Excel (Model Revision 4 - IRP Bifurcation) Updated 5/6/2003 |
|
MS Excel (Model
Revision 3) |
Restructuring
Commitment (RC) Automated Tool (Last Update: April 30, 2008). PAEs
may use this optional tool to produce an RC using Microsoft Word merge.
The required files are in WinZip format below:
|
Instructions
(Zipped PDF File). |
|
Set
of required documents
|
Excel
file (‘AutoRC_04302008.xls’) |
|
Word
mail merge document (‘MergeDoc 04-30-08.doc’) |
|
Copies
of the revised RC and the RC special conditions library of optional clauses for
use by PAEs | |
Firm
Commitment (FC) Automated Tool (Updated: February 11, 2005). PAEs
may use this optional tool to produce an FC. The most significant difference
with the Automated Firm Commitment is that there are two different FC Transmittal
forms: one for standard models and a second for Bifurcated IRP models. It is important
to use the correct version of the Transmittal to ensure all appropriate data is
transferred to the Firm Commitment.
|
Instructions
(Zipped PDF File). |
|
Set
of required documents
|
Instructions
in Adobe pdf format |
|
FC
Transmittals (FC Transmittal 7-16-04.xls and FC Transmittal IRP Bifurcation 7-16-04.xls)
which incorporate information from the underwriting model with a additional tab
of user input information |
|
Mail
Merge document (Automated Firm commitment 07-16-04 Final.doc) which merges information
from the FC Transmittal in to an FC shell to generate a completed Firm Commitment.
|
|
Copy
of the current Firm Commitment | |
OAHP
review and approval of full transactions form (MS
Word / PDF
Format). The form is modified from the January 23, 2003 broadcast.
Note on page 3 a listing of Special Deal Considerations.
Additional funds transactions. OAHP has developed an Additional Funds Transaction
Highlights Memorandum (A/F Memo) to document the critical components of an Additional
Funds transaction from initial submission through closing, and to ensure that
all appropriate approvals and reviews are obtained along the way. Use of the A/F
Memo will be mandatory on/after June 21, 2004. Please refer to the following tools
and documents when completing an Additional Funds Transaction:
For
additional information on Additional Funds Transactions please see Appendix
R of the Operating Procedures Guide (OPG). OAHP
RESOURCES Underwriting
Neighborhood Network Centers
(January 19, 2006). Access to computers and the Internet, and the ability to use
technology effectively are critical in today’s digital age. People who possess
the tools and skills to compete in the global economy are at a distinct advantage
over those who do not have them. What makes Neighborhood Networks so unique and
effective is that technology access is made available onsite at the housing property.
OAHP has created a memorandum which outlines how to underwrite a Neighborhood
Networks Center as part of a Mark-to-Market (M2M) restructuring. The memorandum
also describes the important coordination that is required between the owner,
PAE, Multifamily Neighborhood Networks Coordinator and Multifamily Project Manager,
both in underwriting and post closing. Approval
of the Public Interest Survey Peformance Incentive Fee (March 24, 2004). This
memorandum outlines recent audits that revealed the need to strengthen the process
for approval of the Public Interest Survey performance incentive fee. We have
developed a PAE Certification to ensure the PAE is complying with all OPG requirements
for tenant notices and meetings (including how comments are addressed in the Submission).
We also took the opportunity to modify and add several forms related to the process.
To access the forms go to the OPG Revisions
web page. PAE
Responsibilities for Projects Refinanced with Bond Financing (April 10, 2003).
This memorandum outlines in the PAE's responsibilities with respect to Bond Submission
to OAHP's Bond Department for both Fulls and Lites. (PDF Format) Clearing
of payables at the Mark-to-Market (M2M) closing (February 6, 2003). This memorandum
provides a more formal process for identifying, approving, and clearing payables
prior to a M2M closing. Multifamily
Policy on Payables M2M
Operating Procedures Guide
and Revisions
web pages OAHP's
401.600 Waiver Policy (January 28, 2003)
OAHP
environmental guidance and lead based paint web page New
submission requirements for lite and full transactions Memorandum (PDF Format)
June 8, 2004 Owner
and Purchaser Initiative Matrix, September 11, 2000 Additional
invoicing payment process clarification memo, May 10,
2000 (PDF) Government
contract expense reimbursement travel voucher guide memo,
May 4, 2000 (PDF) Voucher
payment process memo, February 22, 2000 (PDF)
OTHER
RESOURCES U.S. Census Bureau Housing
vacancies and home ownership Case Studies:
Rural
study and Urban
study |